Reproduce step: I created a task and put it in the calendar.
It’s a little bit different from just create an event in the calendar directly. The first method you gave work only when I put event directly not a task to event.
Dan
Team•
Aug 18, 2024
@Intaraprasert Patiparn Feel free to tell me if things don’t work out :) I will close the ticket for now.
Dan
Team•
Aug 16, 2024
Hi @Intaraprasert Patiparn
There is 2 way to edit event time
1. If you click your event on calendar you, You can change date and time for the event
Or if you just drag the event you will be able to move or change duration of time.
Can you tell me if this helps?
rao
•
Aug 20, 2024
It doesn’t let you change the time manually if you have turned off the sync with google calendar I guess as I’m facing the same issue.
the 2nd method of dragging works properly but for that I can be 15 or 30 mins and nothing in between
Log in to comment and vote
Comments4
Intaraprasert Patiparn
Aug 19, 2024
Reproduce step:
I created a task and put it in the calendar.
It’s a little bit different from just create an event in the calendar directly. The first method you gave work only when I put event directly not a task to event.
Dan
Aug 18, 2024
@Intaraprasert Patiparn Feel free to tell me if things don’t work out :) I will close the ticket for now.
Dan
Aug 16, 2024
Hi @Intaraprasert Patiparn
There is 2 way to edit event time
1. If you click your event on calendar you, You can change date and time for the event
Or if you just drag the event you will be able to move or change duration of time.
Can you tell me if this helps?
rao
Aug 20, 2024
It doesn’t let you change the time manually if you have turned off the sync with google calendar I guess as I’m facing the same issue.
the 2nd method of dragging works properly but for that I can be 15 or 30 mins and nothing in between